How long an Arvada exterior repaint really takes.
The painting days are only part of it. Approvals, notices, drying time and weather all go on the calendar.
- Written by our crews
- Sources linked
- Updated Oct 2026

Many single-family exteriors in Arvada take several working days on site: one for washing and drying, one or more for scraping, repairs and caulk, and the rest for primer and two coats. Add time before the start for HOA color approval and, on pre-1978 homes, the required lead pre-renovation notice.
Before the crew arrives
- Booking. Spring and early summer fill first; winter is when to reserve.
- HOA approval. If your community reviews colors, submit early.
- Pre-1978 homes. Colorado requires the Renovate Right pamphlet be provided at least 7 days before work that disturbs painted surfaces (CDPHE lead-based paint and renovation rules).
On site, in order
- Wash, then let the siding dry.
- Scrape, sand, repair siding and trim.
- Caulk and spot-prime.
- Two finish coats on siding and trim.
- Doors, garage doors and touch-ups; walkthrough.
Weather days
Product labels set the temperature floor (for example, 35°F for some premium exterior lines), but rain, wind and wet siding stop work too. Expect the schedule to flex.
Which months actually work in Arvada
The calendar decides a lot of the schedule before the crew ever shows up. Using the NOAA 1991–2020 normals for Denver, here is how the months line up for exterior paint:
| Months | Avg high / low | What it means for exterior paint |
|---|---|---|
| Dec, Jan, Feb | 43–46 / 17–20 | Too cold most days; book now for spring |
| Mar | 54 / 26 | Occasional warm days, but frozen nights and March is our snowiest month on average |
| Apr | 61 / 34 | Workable stretches with low-temperature products; watch the overnight forecast |
| May to Sep | 71–88 / 44–59 | Main season; afternoon storms are the usual interruption |
| Oct | 65 / 36 | Good early, shorter days and colder nights late in the month |
| Nov | 52 / 25 | Only on mild stretches, and only with products rated for it |
Source: NOAA 1991–2020 U.S. Climate Normals, via NWS Denver/Boulder.
What a single painting day looks like
A working day on an exterior is shorter than people expect. The crew can only paint once dew has burned off the siding, and Sherwin-Williams notes most products need at least four hours of dry time before moisture arrives. In practice we start on the side the sun has already reached, follow the shade around the house so we are not rolling paint onto hot siding, and stop coating early enough that the last wall dries before evening. The rest of the day goes to masking, caulking and cleanup.
Product labels add their own limits. Sherwin-Williams' Duration data sheet, for example, requires air, surface and material above 35°F and at least 5°F above the dew point, with no drop below 35°F expected within 48 hours and no rain or snow expected within two to three hours. Traditional latex wants about 50°F. When a cold front threatens any of those, we pause rather than gamble.
What stretches the schedule
- Repairs. Swollen hardboard, rotted fascia or hail-split trim get fixed before paint. See our hardboard siding guide.
- Height. Two-story walls and steep grades mean more ladder moves or a lift.
- Color change. Going from dark to light, or the reverse, can add a coat.
- Lead-safe work. On pre-1978 homes, containment and cleanup add time to every scraping day.
- Storms. Denver averages about 86 days a year with measurable rain or snow, per NWS records, and summer storms tend to arrive in the afternoon.
What you can do to keep it moving
Trim shrubs back from the siding, turn off sprinklers the night before washing and painting days, move cars out of the driveway, and keep pets inside. If your HOA needs color approval, have the letter in hand before the start date.
Book your spring date on our exterior painting page, and see cost ranges.
Questions people ask us
How many days does it take to paint a house exterior?
Many single-family exteriors take several working days on site, plus weather days. Repairs and height add time.
Do I need HOA approval before painting my house?
If your HOA reviews exterior colors, yes. Submit before scheduling so the crew is not waiting on approval.
Can you paint a house exterior in April in Arvada?
Often, on mild stretches. April's average low is about 34°F, so we use products rated for cooler temperatures and watch the 48-hour forecast before each coat.
Tell us about the rooms, walls or cabinets
Pick how you want the estimate: snap photos and we price it virtually, or we come out and walk it with you. Both cost nothing.
Rather talk it through?
720-208-5645
Prefer email? Email the estimating desk